We've had a lot of great progress recently! We passed our electrical inspection!!! Started the sleeping porch deck, installed the interior stairs and began the HVAC installation. Everything's moving right along and it feels wonderful!
Here's some progress on the sleeping porch. Jesse is laying the sleepers in the opposite direction of TPO slope to make the deck level. Lots of math.
|
sleepers tampering to the high side of the TPO water-proofing, polygal wall beyond |
|
High side of the sleepers at the scuppers. The water will flow through the deck toward the scupppers (openings) and down to the screened porch below |
|
Mom (Deborah) sanding the treads for the screened in porch. Richard working hard in the background. Fuzzy Chia the dog laying in the shade taking it easy. |
|
Sanding! |
|
Jesse shoring up the connection between the folding door header and the PSL column. Our structural engineer came out last week for the framing pre-inspection and gave us a checklist to make the structure even stronger. |
|
Thanks Colby for helping Jesse fabricate this piece!! |