Showing posts with label framing. Show all posts
Showing posts with label framing. Show all posts

Friday, December 10, 2010

Framing

The framing is going well so far. Framing is always the fastest part of building a house. It can be very deceptive. As Haas would say, "Never let the client see you frame!"


The first floor was framed in about 2 days. Sara and Haley stopped by to hold up a wall




Then the first floor sheathing and some load bearing interior walls



The second floor is a heart beat away.